logo
Casa ProdottiCilindro forgiato

ASTM DIN Standard High-Pressure Boiler Piping Fitting,Forged Tube High Quality

Rassegne del cliente
Sono molto onesto ai vostri tipi, appena come voi sono onesto a me.

—— Mr.Jorge Luis Castillo

buona qualità, buon servizio, prezzo competitivo.

—— Amit Desai

risparmi i soldi e tempo, gruppo entusiasta e creativo eccellente di qualità, di servizio di prefetto. Grande!

—— Yavorovich Nikolay

Sono ora online in chat

ASTM DIN Standard High-Pressure Boiler Piping Fitting,Forged Tube High Quality

ASTM DIN Standard High-Pressure Boiler Piping Fitting,Forged Tube High Quality
ASTM DIN Standard High-Pressure Boiler Piping Fitting,Forged Tube High Quality ASTM DIN Standard High-Pressure Boiler Piping Fitting,Forged Tube High Quality ASTM DIN Standard High-Pressure Boiler Piping Fitting,Forged Tube High Quality ASTM DIN Standard High-Pressure Boiler Piping Fitting,Forged Tube High Quality

Grande immagine :  ASTM DIN Standard High-Pressure Boiler Piping Fitting,Forged Tube High Quality

Dettagli:
Place of Origin: China
Marca: HUIXUAN
Certificazione: ISO9001:2008,BV,SGS,IST,UL.CTI
Model Number: 20M
Termini di pagamento e spedizione:
Minimum Order Quantity: 10PC
Prezzo: Negoziabile
Packaging Details: wood pallet,steel frame
Delivery Time: 30-50 days
Payment Terms: L/C, T/T
Supply Ability: 2000-4000 Ton/Month
Descrizione di prodotto dettagliata
Max length: 20M Foring ratio: ≥5
Max weight: 3000kg Melting process: LF+EF+VD(ESR)
MOQ: 10PC Payment term: T/T,LC

 

     ASTM DIN Standard High-Pressure Boiler Piping Fitting,Forged Tube High Quality

 

Products reference:

 Material H13, T20502, 4Cr5MoSiV1, 1.2740
Forging equipment

 

2000T forging round machine

 

Application

 

Important perforating tool in seamless steel pipe rolling processing

Melting process LF+EF+VD(ESR)
Process technology

 

Forging+heat treatment+rough machining+finish machining

 

Forging ratio

 

≥5

Applicable standard

 

ASTM,ASME,DIN,JIS,ISO,BS,API,EN

Executive standard

 

JB/GB/EN/DIN/JIS/ASME/ASTM/ISO

Certification authority

 

ISO,BV,SGS, IST, UL,CTI

Delivery term

 

Rough machining(N+T); finish machining(Q+T)

Test equipment

 

Spectrograph,UT device,tensile and impact test machine,metalloscope,hardness test machine

Service Our service included the forging, process, heat treatment, finish machining, package, local logistics, customers clearance and maritime transport. We took the customer’s requirements as the principal thing, and pay attention on the products quality.

 

Custom properties:

Chemical composition C Si Mn P S Cr V Mo

 

Others

T20502 0.32-0.45 0.80-1.20 0.20-0.50 ≤0.030 ≤0.030 4.75-5.50 0.80-1.2- 1.10-1.75  
1.2740 0.24-0.32 0.30-0.50 0.20-0.40 ≤0.030 ≤0.030 0.60-0.90 0.25-0.32 0.50-0.70  

 

Process procedure:

Forging process flow quality control: Raw material steel ingot into warehouse(test the chemical content) → Cutting→ Heating(Furnace temperture test) → Heat treatment after forging(Furnace temperture test) Discharge the furnace(blank inspection)→ Machining→ Inspection(UT,MT,Visal diamention, hardness)→ QT→ Inspection(UT, mechanical properties, hardness, grain size)→ Finish machining→ Inspection (dimension)→ Packing and Marking(steel stamp, mark)→ Storage Shipment

 

Commerce clause:

Max weight 3000KG
MOQ 10PC
Delivery time 20-50 days
Package Wooden,pallet,steel frame
Delivery term FOB;CIF;CFR;DDU;
Payment term T/T,LC
Transportaion

Ocean,air

 

Keywords:

According to different material,Mandrel bar is used for various seamless pipe perforating,

Die block steel mandrel bar is used for stainless steel pipe,normal high alloy steel mandrel bar is used for alloy steel pipe.

 

Advantage:

1.High-precision dimensional tolerance;

2.Excellent mechanical properties;

3.Produce different dimension based on customer’s requirements;

4.Advanced manufacture equipments and inspection devices;

5.Excellent technical personality;

6.Control the production procedure strictly;

7.Pay attention on the package protection;

8.Quality full service.

ASTM DIN Standard High-Pressure Boiler Piping Fitting,Forged Tube High Quality 0

 

Dettagli di contatto
JIANGSU HUI XUAN NEW ENERGY EQUIPMENT CO.,LTD

Persona di contatto: Mr. Arnold

Telefono: +86-15-15-15-81-878

Fax: 86-512-58360318

Invia la tua richiesta direttamente a noi (0 / 3000)